Categories

freshysites

About FreshySites

This author FreshySites has created 28 entries.

Service-Underground Leak

Description of the Service Call from the client: We have an underground steam leak. It is obvious due to the steam billowing out of the ground and from underground vents along with large patches of burned up grass. Discovery phase: Senior Service was called to handle the situation.  Upon arrival at the site, he discovered that the concrete manhole entryways of the underground tunnel were almost full of water that at 197 degrees was not far from boiling. At about 10’ in depth,

company outside event

Star Kid 5K 2025

BION was the “Cosmic Sponsor” for the Star Kid 2025. BION is again so proud to be the lead sponsor for Star Kid and we look forward to helping the INOVA Children’s Hospital in the future.

Construction workers in brick building

BION Safety Going Strong

BION continues to expand their safety talks with CEO Josie Geiger going to the field first hand to share the importance of safety with each of the teams.